OLEA Residence

Boutique residential development of 7 apartments focused on clean architecture, efficient layouts, and high-end execution

Arrow Down Icon - Construcfy X Webflow Template
OLEA Residence
Client Icon - Construcfy X Webflow Template
client
Olive Tree Residence
Surface Icon - Construcfy X Webflow Template
Project type
Multi-unit Residential
Location Icon - Construcfy X Webflow Template
location
Abdoun, Amman
Surface Icon - Construcfy X Webflow Template
Area
2816 sqm
Surface Icon - Construcfy X Webflow Template
Project value
Surface Icon - Construcfy X Webflow Template
Completion date
Under Construction
Residential Construction
services
Residential Construction

The Brief
A high-end residential development comprising 7 luxury units, each with a unique layout and no structural repetition between floors, requiring full coordination across design and construction.

The Problem

  • 7 unique units with no structural continuity between floors
  • Each unit requiring different coordination across structure, MEP, and finishes
  • Excavation works adjacent to an existing building requiring protection
  • Complex shoring requirements during substructure works
  • Multiple trades working across different units simultaneously

Without control:

  • Structural and MEP conflicts due to non-repetitive layouts
  • Increased risk of execution errors across units
  • Potential movement or damage to the adjacent building
  • Delays due to coordination breakdowns and excavation constraints

The Solution

  • Treated each unit as a standalone build while maintaining overall project control
  • Coordinated structure, MEP, and finishes individually for each layout
  • Implemented phased excavation with soil nail anchoring installed at each stage to maintain continuous slope stability
  • Sequenced substructure works in line with shoring and safety requirements
  • Structured site workflow to manage multiple units and trades in parallel

The Outcome

  • All units executed with consistent quality despite unique configurations
  • Excavation and substructure works completed without impact on the adjacent building
  • Controlled progress across multiple work fronts without coordination breakdowns
  • Development delivered in line with the intended architectural standard

‍

Get in touch

Project gallery

No items found.
get in touch

Start your Project

Thanks for joining our newsletter.
Oops! Something went wrong.